Showing 3959 results

Archivistische beschrijving
1316 results with digital objects Show results with digital objects
radiofrequency cavity
CERN-OBJ-AC-028 · Stuk · 1988
Part of Heritage Collection

The pulse of a particle accelerator. 128 of these radio frequency cavities were positioned around CERN's 27-kilometre LEP ring to accelerate electrons and positrons. The acceleration was produced by microwave electric oscillations at 352 MHz. The electrons and positrons were grouped into bunches, like beads on a string, and the copper sphere at the top stored the microwave energy between the passage of individual bunches. This made for valuable energy savings as it reduced the heat generated in the cavity.

Vacuum Valve
CERN-OBJ-AC-030 · Stuk · 1974
Part of Heritage Collection

This valve was used in the Intersecting Storage Rings (ISR) to protect against the shock waves that would be caused if air were to enter the vacuum tube. Some of the ISR chambers were very fragile, with very thin walls - a design required by physicists on the lookout for new particles.

Antiproton Target
CERN-OBJ-AC-039 · Stuk · 1980
Part of Heritage Collection

<!--HTML-->Antiproton target used for the AA (antiproton accumulator). The first type of antiproton production target used from 1980 to 1982 comprised a rod of copper 3mm diameter and 120mm long embedded in a graphite cylinder that was itself pressed into a finned aluminium container. This assembly was air-cooled and it was used in conjunction with the Van der Meer magnetic horn. In 1983 Fermilab provided us with lithium lenses to replace the horn with a view to increasing the antiproton yield by about 30%. These lenses needed a much shorter target made of heavy metal - iridium was chosen for this purpose. The 50 mm iridium rod was housed in an extension to the original finned target container so that it could be brought very close to the entrance to the lithium lens. Picture 1 shows this target assembly and Picture 2 shows it mounted together with the lithium lens. These target containers had a short lifetime due to a combination of beam heating and radiation damage. This led to the design of the water-cooled target in a titanium alloy body <A href="http://weblib.cern.ch/format/showfull?uid=519512&base=OBJOBJ&sysnb=0000166"> (see object AC-020).</A>

LHC magnet support post
CERN-OBJ-AC-047 · Stuk · 1995
Part of Heritage Collection

A prototype magnet support for the Large Hadron Collider (LHC). The magnet supports have to bridge a difference in temperature of 300 degrees. Electrical connections, instrumentation and the posts on which the magnets stand are the only points where heat transfer can happen through conduction. They are all carefully designed to draw off heat progressively. The posts are made of 4 mm thick glass-fibre– epoxy composite material. Each post supports 10 000 kg of magnet and leaks just 0.1 W of heat. This piece required a long development period which started in the early ’90s and continued until the end of the decade. The wires next to the support post are wires from strain gauges, which are employed to measure the stress level in the material when the support is mechanically loaded. These supports are mechanically optimized to withstand a weight of up to 100Kn (10 tons) while being as thin as possible to minimize conduction heat to magnets. This is the reason why the stress measurement was extensively done in the prototyping phase.

Focusing horn
CERN-OBJ-AC-044 · Stuk · 1980
Part of Heritage Collection

This was the first magnetic horn developed by Simon Van der Meer to collect antiprotons in the AD complex. It was used for the AA (antiproton accumulator). Making an antiproton beam took a lot of time and effort. Firstly, protons were accelerated to an energy of 26 GeV/c (protons at 26GeV/c, antiprotons at 3.6GeV/c) in the PS and ejected onto a metal target. From the spray of emerging particles, a magnetic horn picked out 3.6 GeV antiprotons for injection into the AA through a wide-aperture focusing quadrupole magnet. For a million protons hitting the target, just one antiproton was captured, 'cooled' and accumulated. It took 3 days to make a beam of 3 x 10^11 -, three hundred thousand million - antiprotons. The development of this technology was a key step to the functioning of CERN's Super Proton Synchrotron as a proton - antiproton collider.

LHC bending magnet coil
CERN-OBJ-AC-043 · Stuk
Part of Heritage Collection

A short test version of coil of wire used for the LHC dipole magnets. The high magnetic fields needed for guiding particles around the Large Hadron Collider (LHC) ring are created by passing 12’500 amps of current through coils of superconducting wiring. At very low temperatures, superconductors have no electrical resistance and therefore no power loss. The LHC is the largest superconducting installation ever built. The magnetic field must also be extremely uniform. This means the current flowing in the coils has to be very precisely controlled. Indeed, nowhere before has such precision been achieved at such high currents. Magnet coils are made of copper-clad niobium–titanium cables — each wire in the cable consists of 9’000 niobium–titanium filaments ten times finer than a hair.

CERN-OBJ-AC-037 · Stuk · 1995
Part of Heritage Collection

With its 27-kilometre circumference, the Large Electron-Positron (LEP) collider was the largest electron-positron accelerator ever built. The excavation of the LEP tunnel was Europe’s largest civil-engineering project prior to the Channel Tunnel. Three tunnel-boring machines started excavating the tunnel in February 1985 and the ring was completed three years later. In its first phase of operation, LEP consisted of 5176 magnets and 128 accelerating cavities. CERN’s accelerator complex provided the particles and four enormous detectors, ALEPH, DELPHI, L3 and OPAL, observed the collisions. LEP was commissioned in July 1989 and the first beam circulated in the collider on 14 July. The collider's initial energy was chosen to be around 91 GeV, so that Z bosons could be produced. The Z boson and its charged partner the W boson, both discovered at CERN in 1983, are responsible for the weak force, which drives the Sun, for example. Observing the creation and decay of the short-lived Z boson was a critical test of the Standard Model. In the seven years that LEP operated at around 100 GeV it produced around 17 million Z particles. In 1995 LEP was upgraded for a second operation phase, with as many as 288 superconducting accelerating cavities added to double the energy so that the collisions could produce pairs of W bosons. The collider's energy eventually topped 209 GeV in 2000. This object is one of the superconducting cavities from this epoch.

Zonder titel
CERNET Interface Card
CERN-OBJ-IT-015 · Stuk · 1978
Part of Heritage Collection

Homegrown networking technology pre-dating the internet. This is a CERNnet card developed and built at CERN. There was a lot of space on the card between the components, so the engineers decided to put their portraits on it.