Identity area
Reference code
Heritage collection CERN-OBJ-DE-CERN-OBJ-AC-085
Title
FCM dipole magnet
Date(s)
Level of description
File
Extent and medium
1 object
Context area
Name of creator
Biographical history
Repository
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
In an effort to develop economical magnets for an upgrade of the LHC injector complex, CERN started in 2009 an R&D program on superconducting fast cycled magnets (FCM). The program has achieved its objective with the tests of the FCM dipole demonstrator, for which the construction was completed in March 2012. When compared to other magnets for similar application, the CERN FCM has a number of novel features.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Public
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Generated finding aid
Allied materials area
Existence and location of originals
Building 947